Arrange an on-site appointment with our building specialist
Building site assessed
Design and housing requirements discussed
Quote/tender prepared and presented
Tender accepted – payment of Stage 1 planning required
Survey ordered
Section 10.7 document ordered
Fair Trading contract prepared and to be signed
Payment of Stage 2 payment design and approval required
Concept floor-plan and design meeting
Complete architectural working drawing
CDC and/or DA payment required
BASIX Certificate obtained
Stormwater engineering
Sydney Water tap in
Lodgement to private certifier
Select your internal and external colours and materials
10% construction deposit required
Homeowner Warranty Insurance
NTC (Notice To Commence) to certifier
Introduction to the site manager and supervisor
On-site construction commences
Inspections
Contractor certificates
Occupational certificate
Keys given to owner.